MAY/18/25 PLOT 1 Land Opposite The Coppice Great North Road Barnby Moor Nottinghamshire DN22 8QX #11447 · MAY/18/25

Status: won   Value: £500.00

Address: Retford, DN22 8QX, United Kingdom   View on map ↗

Company: Rose & Co Developments Ltd

Brief:

Erection of Five (5) Detached Dwellings (PLOT 1)
Notes
12
Tasks
6
Invoices
0
Contracts
0
Inspections
0

Notes + New note

Completion certificate 18.01.19
enquiry 2019-01-18 10:03:14
final certificate please
enquiry 2019-01-18 09:51:51
Site Inspection: BARNBY MOOR - Completion - 07495911851
enquiry 2019-01-15 13:35:29
Site Inspection: BARNBY MOOR - Completion - 07495911851 - Dean at Rose & Co. - Wondering if we can do the certificate for him the same day
enquiry 2018-12-10 12:08:33
Site Inspection: BARNBY MOOR - Water tightness roof tiled & insulated - 07495911851
enquiry 2018-10-24 13:57:47
Site Inspection: (PLOT 1) NOTTINGHAMSHIRE Joists & DPC - Dean Rose & Co. 07495911851
enquiry 2018-08-06 13:46:04
Invoice 21.06.18
enquiry 2018-06-21 15:14:13
Site Inspection: excavations pm
enquiry 2018-05-23 16:47:39
Acceptance 11.05.18
enquiry 2018-05-11 12:04:09
The project was marked as 'Won'
enquiry 2018-05-11 11:38:01
From: Chris Horton [mailto:chris@jrobertsdesignltd.com]
Sent: 08 May 2018 10:37
To: 'dean'
Cc: 'James Roberts'; 'Dave Birkinshaw'
Subject: FW: 1635 - 5 Dwellings, Great North Road, Barnby Moor - Foundation Assessment

Good Morning Dean,

We attended site on 04/05/2018 to undertake an inspection of the 5No. trial pits. The bearing strata was found to comprise a 1.0m thickness of dense orangey brown silty gravelly Sand, over dense red gravelly Sand. dense sands which are considered adequate to support an applied bearing pressure of 125kN/m². It is therefore recommended that mass fill strip foundations in GEN3 concrete are utilised for the properties with ground bearing ground floor slabs. As an alternative, the mass fill strip may be cast to a thickness of 250mm(min) above the formation level and then brought up in foundation blocks.

The minimum depth of the foundations is required to be 450mm below existing ground level to avoid the effects of frost heave. It is understood that the foundations are proposed to be installed to a depth of 700mm which is considered satisfactory to spread any concentrated loads from garage piers / portal frame columns. This depth may be increased up to 900mm to ensure the footings are formed on competent ground.

The proposals for the foundations as drawn by CRB drawing serviced Ltd. Have been checked and we have the following comments:

Plot 1 – House ok. To the detached garage locally widen strip footing beneath isolated column to 900mm wide for a length of 600mm to accommodate column depth.
Plot 2 – No comments
Plot 3 - House ok. To the attached garage locally widen strip footing beneath isolated column to 900mm wide for a length of 600mm to accommodate column depth.
Plot 4 – Footings around swimming pool to be designed as part of the swimming pool structure for a bearing pressure of 60kN/m² due to the presence of the potential water table – this design is currently in development. To the attached garage locally widen strip footing beneath isolated column to 900mm wide for a length of 600mm to accommodate column depth.
Plot 5 – No comments.

Kind Regards

Chris Horton
Engineer
Tel:- 01709 917154

J Roberts Design Ltd
Structural & Civil Engineering
The Wesley Centre
Blyth Road
Maltby
Rotherham,
S66 8JD
www.jrobertsdesignltd.com
enquiry 2018-05-08 16:41:43
The project was created
enquiry 2018-05-08 16:29:22

Tasks

final certificate please
Due 2019-01-18 00:00:00 · ·
BARNBY MOOR - Completion - 07495911851
Due 2019-01-15 00:00:00 · · Site Inspection
BARNBY MOOR - Completion - 07495911851 - Dean at Rose & Co. - Wondering if we can do the certificate for him the same day
Due 2018-12-10 00:00:00 · · Site Inspection
BARNBY MOOR - Water tightness roof tiled & insulated - 07495911851
Due 2018-10-24 00:00:00 · · Site Inspection
(PLOT 1) NOTTINGHAMSHIRE Joists & DPC - Dean Rose & Co. 07495911851
Due 2018-08-06 00:00:00 · · Site Inspection
excavations pm
Due 2018-05-23 00:00:00 · · Site Inspection