JAN/19/52 28 Wetherby Road York North Yorkshire YO26 5BT #12251 · JAN/19/52

Status: won   Value: £600.00

Address: York, YO26 5BT, United Kingdom   View on map ↗

Company: Mr Patrick Norville

Brief:

Removal of Internal Load-bearing Wall & Part of Existing Chimney Stack & Conversion of Roof Space to Form Loft Conversion
Notes
16
Tasks
10
Invoices
0
Contracts
0
Inspections
0

Notes + New note

Completion certificate 17.01.20
enquiry 2020-01-20 10:25:10
Please send comp cert thank you
enquiry 2020-01-17 11:28:58
Follow Up: comp
enquiry 2020-01-17 10:20:45
Follow Up: Text message
enquiry 2019-09-24 12:03:50
Follow Up: Outstanding items
enquiry 2019-09-03 10:06:09
Site Inspection: YORK - completion call in morning 07933 000884
enquiry 2019-09-02 15:08:57
Follow Up: Door bottom or stairs 07933 000884
enquiry 2019-06-06 10:40:52
Follow Up: Staircase and door
enquiry 2019-06-03 10:24:21
Site Inspection: YORK - Insulation - 07933000884
enquiry 2019-05-30 15:54:10
Calcs added to file -

James,

As requested for the above property, please find attached structural calculations for the steel beams and timber floor joists to the loft conversion. All works have now been installed as such.

I have also attached a u-value calculation for the proposed strategy to insulate the roof to achieve the 0.18 regs.

This is on the basis of a double superquilt solution with a 20mm (32.5mm total) insulated plasterboard to the underside of the raters. The superquilt line will follow the underside of the rafters all the way to the eaves. The insulated plasterboard will follow the rafters to the top of the dwarf walls that sit under the purlins, then the face of the dwarf walls under the purlins will be plasterboarded with rigid insulation between the studs. The eaves will have additional mineral wool circa 200mm sitting at ceiling level.

A 50mm air gap will be left between the sarking felt and first layer of superquilt as regs; airflow to this gap has been achieved with 3nr ventilated roof tiles at the rear of the property. Cross ventilation to the front roof pitch has been achieved by installing a flat ceiling with maintained air flow between front and back as discussed with your office.

We are planning on installing the insulation works this weekend and need to order the materials, so if you see any initial concerns please let me know.

Best Regards
Patrick Norville
07933000884
enquiry 2019-04-30 14:49:01
Callback - Patrick 07933000884 - Tech question
enquiry 2019-02-12 10:55:05
paid bac 06/02/18
enquiry 2019-02-07 12:01:46
Site Inspection: YORK - 2 Steels in & joists in attic - Please call beforehand - 07933000884
enquiry 2019-01-29 13:25:11
IN Acceptance - 17/01/19
enquiry 2019-01-17 12:17:42
The project was marked as 'Won'
enquiry 2019-01-17 12:04:08
The project was created
enquiry 2019-01-17 12:03:54

Tasks

comp
Due 2020-01-17 00:00:00 · · Follow Up
Please send comp cert thank you
Due 2020-01-17 00:00:00 · ·
Text message
Due 2019-09-24 00:00:00 · · Follow Up
Outstanding items
Due 2019-09-03 00:00:00 · · Follow Up
YORK - completion call in morning 07933 000884
Due 2019-08-30 00:00:00 · · Site Inspection
Door bottom or stairs 07933 000884
Due 2019-06-06 00:00:00 · · Follow Up
Staircase and door
Due 2019-05-31 00:00:00 · · Follow Up
YORK - Insulation - 07933000884
Due 2019-05-30 00:00:00 · · Site Inspection
Callback - Patrick 07933000884 - Tech question
Due 2019-02-12 00:00:00 · ·
YORK - 2 Steels in & joists in attic - Please call beforehand - 07933000884
Due 2019-01-29 00:00:00 · · Site Inspection