← Back to projects

APR/19/66 2 Peppermint Way Selby North Yorkshire YO8 4QY #12543 · APR/19/66

Status: won   Value: £485.00

Address: Selby, YO8 4QY, United Kingdom   View on map ↗

Company: Mr Ian Crawford

Brief:

Single Storey Extension to Rear of Dwelling House
Notes
25
Tasks
8
Invoices
0
Contracts
0
Inspections
0

Notes + New note

Completion certificate 19.09.19
enquiry 2019-09-19 11:41:51
Final certificate please megan
enquiry 2019-09-19 09:20:45
Site Inspection: SELBY - Completion - owner out 12.30 Please call beforehand: 07870509571
enquiry 2019-09-18 11:23:08
Call: hi still having issues with what to put in for alarms says can you ring him sparky there at the moment 07870509571
enquiry 2019-07-23 16:43:23
Site Inspection: SELBY steelwork
enquiry 2019-07-18 08:20:06
builder rang office agreed to provide calaculations for the ridge purlin and catnic as requested at klast inspection
enquiry 2019-06-26 09:12:11
Site Inspection: SELBY got slap in on with blockwork aiming pan height for tues andy 07870509571
enquiry 2019-06-25 13:07:27
Site Inspection: SELBY Hard-core and reinfement tovraft
enquiry 2019-06-14 17:26:01
Call: please ring the owner 01757 700417
enquiry 2019-06-13 09:12:18
Stuart
If you were to take the trees out and allow the ground to recover for a season, that would solve your problem and minimize the dig required

Regards

Paul
enquiry 2019-06-11 17:14:15
Hi Paul

I know Andy has discussed with you, so I'm not wanting to step on anyone's toes, but thought it worth mentioning that the trees in question are Leylandii which have been planted as hedging and have grown 4.0-5.0 metres high. The roots are small and relatively shallow.

Any number of these Leylandii can be removed if it helps the situation.

Can you advise?

Best Regards

Stuart Reasbeck

enquiry 2019-06-11 17:13:57
Anndy
The ground may be good but that’s not the issue, it’s the proximity of the trees which means you have to dig to a greater depth to minimize the potential for future movement due to the trees

Regards

Paul
enquiry 2019-06-11 17:13:32
Andy
There are other options as we discussed deep foundations 2.5-3.0m strip footings with a compressible material on the inside or a piles with a reinforced ground beam are your other options both of which require a suspended floor with a void below.
As you know, James Bourke and myself have discussed that the raft is the best structurally & most probably the best cost effective solution in this case, as in the case of deep foundations there is a large concrete volume and the piled solution will need a specialist piling company to design & install the piles then there is the reinforced beams to install and you would still have to construct a suspended floor in both cases

enquiry 2019-06-11 17:13:05
Andy
There are other options as we discussed deep foundations 2.5-3.0m strip footings with a compressible material on the inside or a piles with a reinforced ground beam are your other options both of which require a suspended floor with a void below.
As you know, James Bourke and myself have discussed that the raft is the best structurally & most probably the best cost effective solution in this case, as in the case of deep foundations there is a large concrete volume and the piled solution will need a specialist piling company to design & install the piles then there is the reinforced beams to install and you would still have to construct a suspended floor in both cases

enquiry 2019-06-11 17:13:05
see emails scanned in between struc eng owner and builder
enquiry 2019-06-11 17:06:01
Builder rang has engaged anothercengineeer with lower gradecdesign says will forward details and intends to concrete on Monday am to call on site Friday am to inspect steelwork and hard-core
enquiry 2019-06-11 15:28:56
Phone call to contractor who has sought opinion of anothercengineeer pressuring me to ignorevadvise of Paul Freeman and design forvghem myself said no must get informed opinion from other engineer
enquiry 2019-06-11 09:31:16
Spoke to builder and Client on phone they have contacted the structural engineer Paul and they are not happy with the raft solution he has proposed

Informed them that Paul in a very competent engineer in my opinion however if they wish to seek a second opinion they are able to do do but we will require a report showingnorposed foundation from a qualifies engineer

Owner bordering on the rude on the phone about the engineer

To await response from client and contra tor
enquiry 2019-06-11 08:47:49
Site Inspection: SELBY Excavation am has a problem andy 07870509571
enquiry 2019-06-06 11:15:46
Rang Paul Freeman engineer made him aware of situation in site builder to ring him later today to appoint as designer for the foundations
enquiry 2019-06-06 11:15:19
Cheque received £582.00 - 28/05/19
enquiry 2019-05-28 12:34:13
Drainage Acceptance - 07/05/19
enquiry 2019-05-07 12:13:53
Acceptance 17.04.19
enquiry 2019-04-18 15:00:34
The project was marked as 'Won'
enquiry 2019-04-18 12:30:19
The project was created
enquiry 2019-04-18 12:30:08

Tasks

Final certificate please megan
Due 2019-09-18 00:00:00 · ·
SELBY - Completion - owner out 12.30 Please call beforehand: 07870509571
Due 2019-09-18 00:00:00 · · Site Inspection
hi still having issues with what to put in for alarms says can you ring him sparky there at the moment 07870509571
Due 2019-07-23 00:00:00 · · Call
SELBY steelwork
Due 2019-07-18 00:00:00 · · Site Inspection
SELBY got slap in on with blockwork aiming pan height for tues andy 07870509571
Due 2019-06-25 00:00:00 · · Site Inspection
SELBY Hard-core and reinfement tovraft
Due 2019-06-14 00:00:00 · · Site Inspection
please ring the owner 01757 700417
Due 2019-06-10 00:00:00 · high · Call
SELBY Excavation am has a problem andy 07870509571
Due 2019-06-06 00:00:00 · · Site Inspection